In the past we faced delays and rework due to miscommunication between designers and the site – drawings didn’t always match, leading to onthespot changes. We needed a tool and methodology to unify all project information. With BIM training from Face-to-Face, I gained this capability – working in a single digital environment where architects, engineers and the site share the same model. 

We now all speak the same language by looking at the 3D model, rather than trying to coordinate with drawings and phone calls.

Leave a Reply

Your email address will not be published. Required fields are marked *